1st of 3 scheduled power outages today at Fort IRC

Power is scheduled to be cut off in the Fort IRC today from about 5:15 p.m. to 5:45 p.m. The outage will be the first of three scheduled during the installation of a new emergency generator for the building.

The next power outage is tentatively scheduled for  Saturday October 20, for approximately 8 hours.

The final power outage is scheduled for about 48 hours during Thanksgiving break from Friday November 23  through Saturday November 24.

The new generator will provide electricity for the entire building except for the main chiller.  Occupants of the IRC should  shut down all electrical equipment 30 minutes before each scheduled power outage to prevent damage to  hard drives, power supplies, control panels, etc.

For questions or more information, contact Chris Couch, IRC facilities manager, at 285-3190 or via email.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s